Broadway/Plymouth Safety Improvements Public Meeting
Link: https://www.a2gov.org/news/posts/learn-about-division-street-bikeway-extension-sept-23-and-broadwayplymouth-safety-improvements-nov-9/<br><br><strong><strong>WHAT</strong></strong>: Design concepts for improving safety on Broadway Street from the south end of the Broadway Bridge to the intersection with Plymouth Road will be presented.<br><br><strong><strong>WHEN</strong></strong>: Monday, Nov. 9, from 5 p.m. to 7 p.m.<br><br><strong><strong>WHERE</strong></strong>: City Hall, 301 E. Huron St.<br><br>The November public meeting was prompted by several recent developments that require the city to conduct additional analysis before completing a design concept for the Broadway/Plymouth portion of the project. Those factors include:<ul><li value="1">Broadway Park West development: Additional analysis is needed to account for the installation of a center left-turn lane on the Broadway Bridge to serve the Broadway Park West development.</li><li value="2">Maiden Lane/Moore Street improvements: The city recently received funding through the federal Carbon Reduction Program to modernize and upgrade the intersection of Maiden Lane/Moore Street with Plymouth Road. The potential changes to this intersection need to be incorporated into the broader traffic analysis.</li><li value="3">Emergency access: Working with the Ann Arbor Fire Department, it was determined that the proposed bikeway cannot serve as a fire lane, adding another consideration to the design of the bridge and surrounding roadway.</li></ul>